Solar street lights, floodlights and off-grid lighting for Morocco

Poles, arms and brackets: poles made in Morocco, LALOGO drawings supplied

Street light poles in Morocco: imported poles carry a 25 % safeguard duty, so LALOGO supplies drawings to Moroccan fabricators and ships arms and brackets.

2 products

The price of a street light pole in Morocco is set first by customs: every imported pole of 3 to 12 m carries a 25 % safeguard duty (HS 7308.90.10, all origins, definitive since March 2025). LALOGO therefore sells no imported poles: we supply the drawings of the LS-P6 conical pole (5.7 / 5.8 / 6 / 6.8 / 7.8 m, hot-dip galvanised Q235 steel, 1.5–2.75 mm wall, anchor cage included) to Moroccan fabricators, and we ship the arms, LS-B panel brackets (I-type and full-frame, 15–45° tilt) and fixings with the luminaires.

Which pole for which light? 4–6 m for an LS-A60 (15–20 m spacing), 6 m for an LS-A80, 6–7 m for an LS-A110, 7–8 m for an LS-A120 or an LS-S100 kit, 8–10 m double-arm for an LS-A140 or an LS-S120. The drawings specify the Ø 60 mm spigot, the access door for the battery at the pole base and the anchor-bolt template.

Poles made in Morocco follow NM EN 40-5 (steel poles) and NM ISO 1461 (hot-dip galvanising), the standards cited in the NM 06.8.001 draft; in C4–C5 coastal zones we recommend a duplex treatment of galvanising plus polyester powder coat. LS-B brackets fall under a different tariff heading from poles and travel with the luminaires.

  • Imported poles: 25 % safeguard duty (HS 7308.90.10), all origins
  • LS-P6 drawings from 5.7 to 7.8 m supplied to Moroccan fabricators
  • LS-B panel brackets, 15–45° tilt, hot-dip galvanised
  • Arms, plates and fixings delivered with every luminaire

Compare the models: Poles, brackets & accessories

ModelSolar panel
LS-P6
LS-BI-type (1 panel) or full frame

Send us your road, site or tender specification — get a technical offer within 24 hours

Tell us the road length, pole spacing, lighting class or simply the number of points and the city. Our engineers will propose the right model, autonomy calculation, price and delivery time to Morocco.

Last updated: 23 September 2026