Solar street lights in Casablanca-Settat: the six-commune SDAL and where off-grid solar fits

What the SRM Casablanca-Settat lighting master plan says, the numbers behind Casablanca's public lighting and the zones where LALOGO proposes solar luminaires.

Public lighting in Casablanca is run by SRM Casablanca-Settat, which launched in 2026 a lighting master plan (SDAL) for six communes — Casablanca, Mohammedia, El Jadida, Bouskoura, Ain Harrouda and Bni Yakhlef — with a four-year emergency plan, a CAPEX/OPEX study including solar and hybrid alternatives, and a 'Charte de l'éclairage public' as deliverable (LesEco, 21 May 2026). Casablanca has ≈ 150,000 light points using more than 127 GWh a year according to the Moroccan press (L'Economiste). LALOGO is not a party to the SDAL; this page explains, with numbers, where solar street lights in Casablanca fit within that framework.

What is the Casablanca-Settat SDAL?

A lighting master plan sets, for a territory, the illuminance levels per road type, the colour temperatures and the renovation programme. SRM Casablanca-Settat's plan covers the six communes named, 'tens of thousands of light points' according to LesEco, and must produce a public-lighting charter that will fix the applicable NM EN 13201 classes. The study compares the investment and operating cost of the options, including off-grid solar and hybrid — the point that interests a supplier like LALOGO, and the reason for this page.

The IMANOR guide of February 2026 recalls that public lighting represents 30 to 40 % of a territorial collectivity's energy consumption and is usually its largest budget line.

How much does Casablanca's public lighting cost?

Casablanca had 120,000 light points in 2016 (Challenge.ma, verified figure); the Moroccan press now speaks of ≈ 150,000 points, more than 127 GWh a year and more than 162 million MAD a year (L'Economiste, excerpts). Per light point that gives 127,000,000 ÷ 151,000 ≈ 841 kWh a year, i.e. ≈ 2.3 kWh a night — a derived order of magnitude, to be confirmed by the SRM. ONEE publishes no specific public-lighting tariff; the implied average price, 162 M MAD ÷ 127 GWh ≈ 1.28 MAD/kWh, serves as a proxy.

Where does off-grid solar fit in the SDAL?

Not on Casablanca's boulevards: urban arterials fall into classes M2–M3 on the grid, and Chinese-origin LED luminaires for urban public lighting are subject to the 27 % anti-dumping duty (HS 9405.42.00.10). Off-grid solar is relevant in four situations that the SDAL's CAPEX/OPEX study is meant to cost:

  1. Peri-urban roads and douars without a network in Bouskoura, Bni Yakhlef and Ain Harrouda, where the trench and the board cost more than the luminaire: LS-A60 and LS-A80 on Moroccan-made 5–6 m poles.
  2. Parks, promenades, the corniche, car parks and sports grounds, LS-F200 floodlights (200 W, IP66) or LS-A120 on an 8 m pole, without a buried network.
  3. Existing poles whose cable has failed or been stolen: LS-H60 to LS-H100 heads (60 to 100 W, 40 to 80 Wp panel) fixed on the pole in place, without trenching; NM 06.8.001 explicitly covers all-in-one modules on existing poles and allows a hybrid grid back-up (option on request).
  4. Pilot zones that the public-lighting charter could define to measure real autonomy over a Casablanca winter: LALOGO proposes a documented luminaire list (FR/AR datasheets, IES/LDT, Wh) for that kind of trial.

Which LALOGO models for a pilot zone?

SituationModelLED / lumensPanel / batteryPole / spacing
Peri-urban road 6–7 m, douarLS-A80150 W / ≈ 8,000 lm80 Wp / 256 Wh6 m / 20–25 m
Lane, park pathLS-A60120 W / ≈ 6,000 lm60 Wp / 192 Wh4–6 m / 15–20 m
Car park, peri-urban junctionLS-A120256–300 W / ≈ 12,000 lm120 Wp / 384 Wh7–8 m / 25–30 m
Peri-urban boulevard, double armLS-S100100 W head200 Wp separate / 12.8 V 70–100 Ah7–8 m
Existing 5–6 m poleLS-H6060 W head40 Wpexisting
Existing 7–8 m poleLS-H100100 W head80 Wpexisting
Sports ground, square, cornicheLS-F200200 W floodlight, IP66separate panel, Wp/Wh on request · 12–16 hpole or façade
Isolated square, anti-theftLS-C100100 W + 4G camera 4 MPWp/Wh on request5–6 m

Sizing on December in Casablanca: 2.99 kWh/m²/day on a horizontal panel, 4.93 on a panel tilted at 32° (+65 %) — PVGIS-SARAH2 2005-2020, JRC. An LS-A80 harvests 80 × 2.99 × 0.72 ≈ 172 Wh a day for a 256 Wh battery (system efficiency 0.70–0.75, engineering assumption). Autonomy: up to 12 h per night, 3–5 days of reserve at the default profile; it depends on irradiation and on the dimming profile.

Coast: which corrosivity class for Casablanca, Mohammedia and El Jadida?

There is no Moroccan ISO 9223 map; LALOGO applies an engineering classification by distance to the sea: seafront (Corniche, Aïn Diab, Mohammedia, El Jadida sea walls, port zone, Dar Bouazza) = C5-M; the belt within one kilometre and Mohammedia's industrial zone = C4; inland Casablanca, Bouskoura, Bni Yakhlef = C3. In C5 zinc loses 4.2 to 8.4 µm a year: an 85 µm NM ISO 1461 galvanised coating is consumed in about ten years (85 ÷ 8.4 ≈ 10), against 20 to 40 years in C4 — hence the IP66 coastal version and the duplex galvanising + ISO 12944 paint we specify (relative humidity 82 % in Casablanca).

Mohammedia: seafront and industrial zone

Seafront in C5-M, industrial zone in C4: beach car parks, promenades and industrial-zone roads; IP66 coastal version throughout.

El Jadida: ramparts and seafront

Seafront and rampart surroundings in C5-M, inland districts in C3–C4: promenades, car parks and outlying-district roads; LS-H heads on existing poles without reopening the road.

Bouskoura: inland and growing

An inland commune (C3) growing fast: estate roads not yet handed over, parks and links to neighbouring douars, typical ground for an LS-A80 on a 6 m pole.

Ain Harrouda: corridor between Casablanca and Mohammedia

Coastal strip (C4–C5) and activity corridor: car parks, activity zones and peri-urban roads; LS-F200 for squares, LS-A120 on 8 m for off-grid junctions.

Bni Yakhlef: peri-urban and douars

An inland, peri-urban and rural commune (C3), the textbook case for off-grid solar: douars and tracks without a network where LS-A60 and LS-A80 on Moroccan-made 5–6 m poles replace trench, cable and board.

Which documents and which procedure?

The SRM and the communes buy through public contracts on marchespublics.gov.ma: a specification with the NM EN 13201 class, the NM 06.8.001 reference, IP/IK specified by the client (IP66 / IK08 recommended on the coast), NM EN 40-5 pole galvanised to NM ISO 1461, Cم marking. LALOGO supplies FR/AR/EN datasheets, IES/LDT files on request, the Cم declaration, LS-P6 pole drawings and wording for the specification. LALOGO's NM 06.8.001 file is in progress. The pole is Moroccan-made (25 % safeguard duty on imported poles, HS 7308.90.10); the customs classification of the luminaire is confirmed by our forwarder.

Worked example: 1 km of peri-urban road in Bni Yakhlef

A 7 m road without a network (indicative class P3–M6) linking two douars. LS-A80 on Moroccan-made 6 m poles every 22 m: 1,000 ÷ 22 ≈ 45 intervals, i.e. 46 luminaires; 1 LS-C100 at the entrance junction. December balance: ≈ 172 Wh harvested a day per luminaire for a 256 Wh battery; default profile with mid-night dimming and PIR. The avoided trench, cable and board are inputs only the SDAL's CAPEX/OPEX study can fix. Price on quotation in MAD.

WhatsApp quote: 'Hello LALOGO, solar public lighting, Casablanca-Settat' at +212 6 68 58 03 53.

Frequently asked questions

Is LALOGO involved in the Casablanca-Settat SDAL?

No. The SDAL is led by SRM Casablanca-Settat with the six communes concerned; LALOGO is not a party to it. We publish this page to explain, with public figures and their sources, where off-grid solar fits, and we keep a documented luminaire list (FR/AR datasheets, IES/LDT, Wh) available to technical departments for a pilot zone.

How many light points does Casablanca have?

120,000 in 2016 according to Challenge.ma (verified figure); ≈ 150,000 today according to the Moroccan press (L'Economiste), for more than 127 GWh and more than 162 million MAD a year. The SRM's SDAL covers six communes and 'tens of thousands of light points' (LesEco, May 2026). These orders of magnitude remain to be confirmed by the SRM.

Does a solar street light last a Casablanca winter?

Yes if it is sized on December: 2.99 kWh/m²/day on a horizontal panel, 4.93 on a panel tilted at 32° (PVGIS-SARAH2, JRC), for a 14.1 h night. An LS-A80 harvests ≈ 172 Wh a day in December for a 256 Wh battery; the controller follows the programmed dimming profile (the adaptive dimming NM 06.8.001 requires is confirmed model by model in the offer). Autonomy up to 12 h per night, 3–5 days of reserve at the default profile.

Which version for Mohammedia, El Jadida or the Corniche?

The IP66 coastal version with marine-grade coating, NM ISO 1461 hot-dip galvanised pole with ISO 12944 paint and stainless fasteners. Seafront = class C5-M, the belt within one kilometre and Mohammedia's industrial zone = C4, inland = C3 (LALOGO engineering classification based on ISO 9223, in the absence of a Moroccan map). Salt-spray report on request.

Are solar street lights affected by the 27 % anti-dumping duty?

The 27 % duty targets Chinese-origin LED luminaires for urban public lighting (HS 9405.42.00.10). The classification of all-in-one solar street lights is not settled; LALOGO has requested a binding ruling for several models and claims no exemption until then: the customs classification is confirmed by our forwarder, order by order. The poles are Moroccan-made (25 % safeguard on imported poles).

Can Casablanca's existing poles be retrofitted with solar heads?

Yes, where the cable has failed or been stolen and the pole is sound: LS-H60 heads (60 W, 40 Wp) on 5–6 m poles, LS-H100 (100 W, 80 Wp) on 7–8 m, without trenching. NM 06.8.001 covers all-in-one modules on existing poles and allows a hybrid grid back-up (option on request). We check orientation, shading and pole condition before proposing this retrofit.

Other sectors: Communes and douars · Residential estates and syndics · Farms and agriculture · Industrial zones and car parks · Hotels, riads and resorts · Solutions

LALOGO models for this sector

Send us your road, site or tender specification — get a technical offer within 24 hours

Tell us the road length, pole spacing, lighting class or simply the number of points and the city. Our engineers will propose the right model, autonomy calculation, price and delivery time to Morocco.

Last updated: 23 September 2026